IS/IEC 62305 & IS 3043 Compliant Systems · ARK Make
MAINTENANCE

Annual LPS Maintenance Checklist for Facility Teams

11 February 2026 · 4 min read

A visual and instrumented inspection routine that keeps your system compliant and your insurance valid.

Visual inspection

Check air terminals for corrosion and mechanical damage, confirm conductor fixings at specified spacing, look for broken bonds at expansion joints, and verify that new rooftop equipment has been bonded into the existing mesh.

Instrumented tests

Measure continuity across every test link, record earth resistance at each electrode, log strike counter readings, and confirm SPD status indicators. IEC 62305-3 recommends annual inspection for LPL I and II systems, with a full test every two years.

TALK TO AN ENGINEER

Send your drawings. Get a compliant system design back.

Share roof plans, structure height and soil data — our team returns a risk assessment summary, air termination or earthing layout, bill of materials and a fixed-price proposal.

  • Risk assessment to IS/IEC 62305-2
  • IEC 62561 type-tested ARK Make components
  • Installation, testing and documented handover

Typical response within one working day. Your details are used only to respond to this enquiry.